Full Kitchen Remodel

A full remodel is the version where the room is emptied and rebuilt: cabinets, countertops, flooring, lighting, and usually some movement of plumbing or electrical. It is also the version where every permit rule in your city applies at once.

Sequence of a full kitchen remodelDesignPermitDemoRough-inFinish

What it involves

Design and product selection come first and take longer than most people expect, because cabinet dimensions fix everything downstream. Permits follow the drawings. Demolition is fast. Rough-in — plumbing, electrical, any framing change — is where inspections cluster and where whatever is inside the walls finally reveals itself. Finishes go last, and countertops cannot be templated until the cabinets are physically set.

Permits, and why the city matters

In Kansas City, Missouri this scope routes to an interior remodel permit supported by a written scope-of-work letter and existing and proposed floor plans, with separate permit applications for each trade involved. In Kansas City, Kansas, scaled drawings are required on every residential application, though the plot plan is waived when work stays inside the existing footprint. In Overland Park the cabinets themselves are exempt, but the electrical and plumbing that comes with them is not. Because a full remodel touches everything, assume permits and ask early.

What it costs

Published regional figures put a minor midrange kitchen remodel in Kansas City at about $27,800 and a major midrange remodel at about $82,300 — according to the Remodeling 2025 Cost vs. Value Report (www.costvsvalue.com).

© 2025 Zonda Media, a Delaware Corporation. Complete data from the Remodeling 2025 Cost vs. Value Report can be downloaded free at www.costvsvalue.com.

Those are typical published figures for the market rather than an estimate for your kitchen. The gap between them is mostly scope and cabinet tier.

Common questions

How long does a full kitchen remodel take?
Longer than the on-site work suggests, because design and cabinet lead times happen before anyone arrives. Ask any firm quoting you to separate lead time from build time — the two are often confused in a single number.
Can I stay in the house?
Most people do. Plan for the kitchen being unusable for the duration and for dust control during demolition, which matters more in a pre-1978 home where lead-safe work practices apply.